All projects
TCO Future Growth Project / Wellhead Pressure Management Project (FGP-WPMP)
Project
Construction of a gas chemical complex in the Atyrau region
Project
Kashagan Growth Projects
Project
Construction of a Seawater Desalination Plant in Kenderli
Project
Improving operational efficiency at Ozenmunaigas JSC (RLG)
Project
Abai Project
Project
Introduction of Lean 6 Sigma program in the Oil and Gas Production business line
Project
Introduction of the «Bank of Ideas» platform
Project
Introduction of a project management system in KMG (PMS)
Project
Introduction of information security system (Cybershield)
Project
Introduction of engineering models at the refineries of the Republic of Kazakhstan
Project
Creation of a digital master plan and 3D model of the refineries of the Republic of Kazakhstan
Project
Introduction of Computer Simulator Systems (CSCs) at the Refineries of the Republic of Kazakhstan
Project
Construction of a 120 MW Hybrid Power Plant
Project
Construction of a 1 GW Hybrid Wind Farm Project Using the 300 MW/600 MWh Energy Storage System (Mirny Project)
Project
Karaton Pre-Salt Project
Project
Polyethylene Project
Project
Winter Diesel Production
Project
The First Stage of the Reversal of the Kenkiyak-Atyrau Oil Pipeline Section with a Capacity of up to 6 Million Tons Annually
Project
Oriktau
Project
Rozhkov Development
Project
Turgai Paleozoic
Project
Kalamkas-sea and Khazar Fields Joint Development Project
Project
Marine geological exploration projects
Project
Karachaganak Production Rate Maintenance Projects
Project
TAZALYQ
Project
Construction of a New Gas Processing Plant in Zhanaozen
Project
Reconstruction and Expansion of the «Astrakhan-Mangyshlak» Main Waterline – 1st Stage
Project